Working Days

  • Thread starter Thread starter BilboBaggins
  • Start date Start date
B

BilboBaggins

Hi all
I am trying to calculate the number of working days
between two variable dates in a query. I have tried the
Excel Networkdays function but it does not recognise it.
I have checked and I have MSOWCF.DLL installed in the
references as it recommends. Is there another way of
doing this or am I likely to be doing something wrong?
 
Back
Top