G
Guest
Hi, i have done a line graph and all my date have values say 2 - 3 so lots of
date say 2.13, 2.45 and there are 12 lots of data etc etc, i have produced my
graph and the value axis reads 0 0.5 1 1.5 2 2.5 3 3.5, is there anyway i can
get it to read from 2 - 3 so everything fits on as i have 12 lots of data and
everything is squashed on at the top..? Hope that makes sense?
date say 2.13, 2.45 and there are 12 lots of data etc etc, i have produced my
graph and the value axis reads 0 0.5 1 1.5 2 2.5 3 3.5, is there anyway i can
get it to read from 2 - 3 so everything fits on as i have 12 lots of data and
everything is squashed on at the top..? Hope that makes sense?