S
signit
I followed KB 255690 and transferred the roles from one DC to the next.
I go to the last one which is the scheme master and I noticed that there
wasn't a single PDC selected. It said any. I transferred it to one computer.
Should I leave it on any so all DCs can be the Schema master? Or can only
one be.
To top it off im al little confused about Roles. I thought there were 3
roles that are on every DC and two roles that are only on the first DC that
was installed in the Forrest?
Can anyone clear this up?
thanks
I go to the last one which is the scheme master and I noticed that there
wasn't a single PDC selected. It said any. I transferred it to one computer.
Should I leave it on any so all DCs can be the Schema master? Or can only
one be.
To top it off im al little confused about Roles. I thought there were 3
roles that are on every DC and two roles that are only on the first DC that
was installed in the Forrest?
Can anyone clear this up?
thanks