timeline to graphicate vacations periods of a group

  • Thread starter Thread starter ANDY894219
  • Start date Start date
A

ANDY894219

I have several team members, and they chose each of them, a different
timeframe for thier annual vacations. I will need to graphicate that, in a
bar 2D system, having the complete year 2009 in the axis X, and the bars,
floting according to the dates, in the axis Y, one bar per person.
 
Back
Top