G
Glenn Cornish
I am trying to get a result that will show me the difference, in hours and
minutes, between two times. The application is on a staffing roster, and
what i want to be able to do is calculate working hours in the day, so
difference between start time and finish time less a predetermined amount
for lunch breaks (1/2 hour). So if someone starts at 9am and finishes at
5pm, i need the result to be 7 1/2 hours.
I have been unable to find a solution to this, so any help would be greatly
appreciated
glenn
minutes, between two times. The application is on a staffing roster, and
what i want to be able to do is calculate working hours in the day, so
difference between start time and finish time less a predetermined amount
for lunch breaks (1/2 hour). So if someone starts at 9am and finishes at
5pm, i need the result to be 7 1/2 hours.
I have been unable to find a solution to this, so any help would be greatly
appreciated
glenn