J
Jim Varner
Frankly, I'm embarrassed to share this but.....I have a rather large slide
show in process. All the slides had various lengths of times that they were
to stay before transitioning on to the following slide. I apparently,
unwittingly, changed all the timings back to 10 seconds. I'm willing to pay
the "stupid tax" on my error and go back and re-time everything....but WHAT
would, could, I have done to cause that? I want to make sure I don't do it
again cause it's going to take me 3-4 hours to fix the problem. (PP2007).
If I were to have a "wish list" in this program (some programs overkill on
safeguards)....I would like to see and "are you SURE warning" before a
global change is executed--but nobody asked me, did they?
Jim
show in process. All the slides had various lengths of times that they were
to stay before transitioning on to the following slide. I apparently,
unwittingly, changed all the timings back to 10 seconds. I'm willing to pay
the "stupid tax" on my error and go back and re-time everything....but WHAT
would, could, I have done to cause that? I want to make sure I don't do it
again cause it's going to take me 3-4 hours to fix the problem. (PP2007).
If I were to have a "wish list" in this program (some programs overkill on
safeguards)....I would like to see and "are you SURE warning" before a
global change is executed--but nobody asked me, did they?
Jim