C
Charles Eichhorn
When my Outlook 2003 Calendar is in a 7 column/ Work Week view, I want to be
able to scroll horizontally one day at a time, not a whole week at a time.
I was not able to do this, then for just one day it was possible, and now it
is not happening again. I must have set something just right by accident.
How do I get the single day horizontal scrolling back in the "5 Work Week /
7 column view?
able to scroll horizontally one day at a time, not a whole week at a time.
I was not able to do this, then for just one day it was possible, and now it
is not happening again. I must have set something just right by accident.
How do I get the single day horizontal scrolling back in the "5 Work Week /
7 column view?