A a Jan 5, 2007 #1 Hi For the task scheduler, after the scheduled task was run, where is the log? Thanks
P Pegasus \(MVP\) Jan 5, 2007 #2 a said: Hi For the task scheduler, after the scheduled task was run, where is the log? Thanks Click to expand... In the Task Scheduler itself, under the Advanced pull-down menu.
a said: Hi For the task scheduler, after the scheduled task was run, where is the log? Thanks Click to expand... In the Task Scheduler itself, under the Advanced pull-down menu.