Running WD on a Schedule

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

.. Does WI have ED scheduled to run every Monday night at 10PM so why didnt
it run at ann on 02/27/2006? The program has been installed since 02/14/2006
and last run on )2/20/2006 at 11:07PM. Does WD have to be scheduled through
Schedled Programs to run on a specific schedule?
 
Was the machine powered on at 10 PM on Monday the 27th?

Scheduling in the program is the only action that should be necessary--that
and having the machine turned on at the scan time. In fact, if the scan is
missed, it should take place on a subsequent boot, as I understand it.
 
Back
Top