maxtre
Hi!
I've tried to work through the several charts formatting techniques bu
still haven’t found the answer to what seems to be a simple concept.
I work at a motorway concessionaire. Our traffic comparisons are mad
in relation to a reference traffic scenario, being divided in su
stretches with different length.
1 THE SIMPLE WAY (NOT FOR ME, BUT FOR ANYONE I HOPE
The length should be in the x axis of this chart. Only one bar would b
necessary, being that a sum of the several bars (stacked bar chart?
with it’s length proportional to the sub stretches length.
Each bar should have a different colour, according to the deviatio
from the reference traffic scenario. I attached a chart in an xl fil
with the final, required result… I only don’t know how I get ther
automatically!
2 THE NOT SO SIMPLE WAY (NOT FOR ME, BUT FOR ANYONE SPECIAL I HOPE
I would “draw” a map of the motorway in an excel chart, for which
would have to produce x and y values so it would get close to reality
This chart would be a simple line chart, but each part of the lin
would be a sub stretch and it’s colour should change with the deviatio
towards the reference values… Any help?
Don’t find me conservative towards vb, but I would really like to stic
to an excel “traditional” answer…
So thanks for any help at all.
Pedr
I've tried to work through the several charts formatting techniques bu
still haven’t found the answer to what seems to be a simple concept.
I work at a motorway concessionaire. Our traffic comparisons are mad
in relation to a reference traffic scenario, being divided in su
stretches with different length.
1 THE SIMPLE WAY (NOT FOR ME, BUT FOR ANYONE I HOPE
The length should be in the x axis of this chart. Only one bar would b
necessary, being that a sum of the several bars (stacked bar chart?
with it’s length proportional to the sub stretches length.
Each bar should have a different colour, according to the deviatio
from the reference traffic scenario. I attached a chart in an xl fil
with the final, required result… I only don’t know how I get ther
automatically!
2 THE NOT SO SIMPLE WAY (NOT FOR ME, BUT FOR ANYONE SPECIAL I HOPE
I would “draw” a map of the motorway in an excel chart, for which
would have to produce x and y values so it would get close to reality
This chart would be a simple line chart, but each part of the lin
would be a sub stretch and it’s colour should change with the deviatio
towards the reference values… Any help?
Don’t find me conservative towards vb, but I would really like to stic
to an excel “traditional” answer…
So thanks for any help at all.
Pedr