Hi all,
I am in the planning process of replacing a Windows 2000 Master DC &
Exchange 5.5 with a new machine. I believe I need to build a DC and
transfer all the FSMO roles over. Most recommendation I read is to
turn of the original DC for a few days to ensure there is no problem
before demoting it. As in this case, Exchange is on the same server
and therefore I can only afford to have it down for a weekend. Can
anyone tell me how long should I wait for the DC replication and how
should I check if the new DC is running properly on the network?
Thanks in advance,
Mei Ling
I am in the planning process of replacing a Windows 2000 Master DC &
Exchange 5.5 with a new machine. I believe I need to build a DC and
transfer all the FSMO roles over. Most recommendation I read is to
turn of the original DC for a few days to ensure there is no problem
before demoting it. As in this case, Exchange is on the same server
and therefore I can only afford to have it down for a weekend. Can
anyone tell me how long should I wait for the DC replication and how
should I check if the new DC is running properly on the network?
Thanks in advance,
Mei Ling