J
Jeff
When I link cells from the master worksheet (Past
special - insert link) I get zeros in the slave
worksheet. Since the information that I need to link
between worksheet is TEXT -- I formatted the cells for
text in both worksheets and still get all zeros in the
slave. I need the cells in the slave to be empty (not
filled with zeros) until information is added to the
master. Any suggestions??
special - insert link) I get zeros in the slave
worksheet. Since the information that I need to link
between worksheet is TEXT -- I formatted the cells for
text in both worksheets and still get all zeros in the
slave. I need the cells in the slave to be empty (not
filled with zeros) until information is added to the
master. Any suggestions??