R
Roberto (Brazil)
I want to make a new model of chart, i don´t no is or not possible.
I seed that in a company presentation, but maked it with two grups os value
and is very dificult to atualized.
Imagine the sample below with colums:
Ebit 2007 price volume cost expenses EBIT 2008
15 +5 +2 -3 -2 17
but the "price" begin your colum in the top line of "Ebit 2007", the next
colum "volume" begin in scale 20, because is 15 + 5 for a price, the next
"cost" must the top of the colum at the number 22 and go down 3....
chart:
xxxxx
xxxxx
xxxxx xxxxx
xxxxx xxxxx
xxxxx xxxxx
xxxx
xxxx
xxxx
xxxx
ebit price volume cost
I seed that in a company presentation, but maked it with two grups os value
and is very dificult to atualized.
Imagine the sample below with colums:
Ebit 2007 price volume cost expenses EBIT 2008
15 +5 +2 -3 -2 17
but the "price" begin your colum in the top line of "Ebit 2007", the next
colum "volume" begin in scale 20, because is 15 + 5 for a price, the next
"cost" must the top of the colum at the number 22 and go down 3....
chart:
xxxxx
xxxxx
xxxxx xxxxx
xxxxx xxxxx
xxxxx xxxxx
xxxx
xxxx
xxxx
xxxx
ebit price volume cost