A
anonymous354
Hi,
I am using Excel to create a simple time sheet. When I
take the result of the deduction between time in and time
out, and multiply it by the hourly wage, I get a number
that does not correspond to the right number.
For example, if the amount build is 5:30 (hours:minutes)
and I multiply it to $10, the product is 7:00. It is
obviously the wrong product, the product should be
$55.00. Thus, what should I do in order for Excel to
recognize 5:30 as numbers?
Thank you.
I am using Excel to create a simple time sheet. When I
take the result of the deduction between time in and time
out, and multiply it by the hourly wage, I get a number
that does not correspond to the right number.
For example, if the amount build is 5:30 (hours:minutes)
and I multiply it to $10, the product is 7:00. It is
obviously the wrong product, the product should be
$55.00. Thus, what should I do in order for Excel to
recognize 5:30 as numbers?
Thank you.