K
Kris
I'm trying to set up a pie in pie chart and I'm not sure
what I'm doing wrong. I have 3 data points for the main
pie and 5 data points for the secondary pie. Both sets
total 100%, but what is happening is that in the main pie
it's giving me 4 data points - the extra point is
called "other" and that is what the secondary pie is an
off-shoot of. I'm not sure why Excel is doing this. Any
ideas?
what I'm doing wrong. I have 3 data points for the main
pie and 5 data points for the secondary pie. Both sets
total 100%, but what is happening is that in the main pie
it's giving me 4 data points - the extra point is
called "other" and that is what the secondary pie is an
off-shoot of. I'm not sure why Excel is doing this. Any
ideas?