D
Dave Shultz
I am trying to use the Pie of Pie chart to represent the
data below. I want the pie chart on the left to show PS,
Unspecified, ECP and a sum of AHD status. And the pie on
the right will show the breakdown of the AHD status. How
do I do this?
Status Total
ECP 2
PS 287
Unspecified 45
AHD Analysis Complete 18
AHD Analysis in Progress 461
AHD Closed 317
AHD Implemented 109
AHD Work Assigned to Resource 24
AHD Work Authorized 35
data below. I want the pie chart on the left to show PS,
Unspecified, ECP and a sum of AHD status. And the pie on
the right will show the breakdown of the AHD status. How
do I do this?
Status Total
ECP 2
PS 287
Unspecified 45
AHD Analysis Complete 18
AHD Analysis in Progress 461
AHD Closed 317
AHD Implemented 109
AHD Work Assigned to Resource 24
AHD Work Authorized 35