G
Guest
We are working with two different versions of Word. On one version the Date
is showing up as 3/23/2006 (the date), but on the other version, it is
showing up as the hyperlink { DATE\@ "M/d/yyyy"}. How do you get it to show
up as the Date vs the hyperlink?
Thank you in advance.
is showing up as 3/23/2006 (the date), but on the other version, it is
showing up as the hyperlink { DATE\@ "M/d/yyyy"}. How do you get it to show
up as the Date vs the hyperlink?
Thank you in advance.