Here is my problem...
I work for a prduction facility that currently uses
schedule plus and I am trying to convert to outlook
2000/exchange 2000.
In the current schedule plus setup, all 9 installers have
their own appointment for the day, and all 9 installers
can be seen by the supervisor.
After converting a copy of the schedule plus to outlook
2000, we can no longer see all 9 installers appointments,
while in a single day or even a 5 day view.
If i change to a 7 day view, i can now see all
appointments, and have to doubleclick on each to see the
details. This of course in unacceptable to the supervisor.
How can I set the view, in a 5 day or single day view, to
see more than 5 or 6 similtanious <sp> appointments?
thanks!
I work for a prduction facility that currently uses
schedule plus and I am trying to convert to outlook
2000/exchange 2000.
In the current schedule plus setup, all 9 installers have
their own appointment for the day, and all 9 installers
can be seen by the supervisor.
After converting a copy of the schedule plus to outlook
2000, we can no longer see all 9 installers appointments,
while in a single day or even a 5 day view.
If i change to a 7 day view, i can now see all
appointments, and have to doubleclick on each to see the
details. This of course in unacceptable to the supervisor.
How can I set the view, in a 5 day or single day view, to
see more than 5 or 6 similtanious <sp> appointments?
thanks!