G
Guest
For weekly report, I have set up a template (report_wk.dot) with links to
charts in Excel spreadsheets. Once current position is established (by
updating links when template opened), I want to break the links to save a
snapshot of the weekly status (as report_wk_n.doc).
Seems simple?
Using Edit/Links to break all the links doesn't work. All the links are
removed from the list and the document is saved, but there seems to be some
residual link back to the original template, and its links to the Excel
charts.
When I open report_wk_n.doc I get asked if I want to update links, but the
Edit/Links command is greyed out.
Looking at windows explorer, I can see the template listed as ~$rt_wk.dot
which usually means the document is open for editing.
Help - how can I get rid of the links, so that I can distribute the report
without questions re update.
charts in Excel spreadsheets. Once current position is established (by
updating links when template opened), I want to break the links to save a
snapshot of the weekly status (as report_wk_n.doc).
Seems simple?
Using Edit/Links to break all the links doesn't work. All the links are
removed from the list and the document is saved, but there seems to be some
residual link back to the original template, and its links to the Excel
charts.
When I open report_wk_n.doc I get asked if I want to update links, but the
Edit/Links command is greyed out.
Looking at windows explorer, I can see the template listed as ~$rt_wk.dot
which usually means the document is open for editing.
Help - how can I get rid of the links, so that I can distribute the report
without questions re update.