Need a month calendar which captures Outlook info-not the default

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

I need a monthly calendar which starts weeks with Sunday, ends Saturday,
captures appointments I have logged in Outlook, permits editing, allows the
printing of only one month at a time. The calendar that came with Windows 98
would be perfect.
Jim
 
SugarbushJim said:
I need a monthly calendar which starts weeks with Sunday, ends Saturday,
captures appointments I have logged in Outlook, permits editing, allows
the
printing of only one month at a time. The calendar that came with Windows
98
would be perfect.
Jim


Umm I think you'll find the OUTLOOK calendar will do that?
 
The Outlook calendar option I get shows the week starting with Monday,
Sat/Sun are in position 7 shown as half day sizes. When I print i get a
3-month block of Oct Nov Dec even at this date of 13Nov07. I do not seem to
be able to edit in these 3 calendars. Am I missing options to design the
calendar with 7 days, print only one month, etc.?
Jim
 
Made the changes as you suggested...no affect on my calendar...starts on
Monday, prints 3, etc. Closed OUTLOOK, opened it again, changes still in
place but calendar same as always.
Jim
 
SugarbushJim said:
Made the changes as you suggested...no affect on my calendar...starts on
Monday, prints 3, etc. Closed OUTLOOK, opened it again, changes still in
place but calendar same as always.

interesting - mine changes instantly....are you on an Exchange server, or is
this a stand-alone outlook?
 
This computer is not on a network...stand alone

Gordon said:
interesting - mine changes instantly....are you on an Exchange server, or is
this a stand-alone outlook?
 
SugarbushJim said:
This computer is not on a network...stand alone

Strange - if I go to Tools-Options-preferences-Calendar options, and change
the first day of the week in the drop-down box and click OK, it changes as I
do that.... Outlook 2007....
 
SugarbushJim said:
If I duplicate your action nothing happens...Outlook 2003

You're printing a seven day week calendar, I suspect. In what view are you
when you print?
 
The Month view. Even if I respond to the request for start and stop dates, I
get 3 months of Mon thru Fri plus a split day for Sat/Sun. I think I did not
get this capability installed correctly at installation time.
 
SugarbushJim said:
The Month view. Even if I respond to the request for start and stop
dates, I get 3 months of Mon thru Fri plus a split day for Sat/Sun.
I think I did not get this capability installed correctly at
installation time.

Right-click an empty area of the Month view and choose Other Settings.
Uncheck "Compress weekend days":
 
Back
Top