M
Matt Burks
I have a lab system running Win2K3 RC2. I have it configured will all of our
user accounts as well as GPOs. Would it be possible for me to, when the
production server arrives, just set it up as an additional server in an
existing domain that way all of the settings will just transfer over to the
"real" server. Then after that is done just take down the old beta server?
What issues can anyone see coming from this?
Thanks,
Matt
A+, MCP
user accounts as well as GPOs. Would it be possible for me to, when the
production server arrives, just set it up as an additional server in an
existing domain that way all of the settings will just transfer over to the
"real" server. Then after that is done just take down the old beta server?
What issues can anyone see coming from this?
Thanks,
Matt
A+, MCP