G
Guest
Hi
I need to upgrade my forest from 2000 to 2003.
Before run Adprep utility I need to movo the schema FSMO role to another DC to unplug it from the network as written in Technet article.
But when I try to move it Schema from my server02 to my server03 from MMC schema snap in I recive this error message:
The current Domain Controller is the Operations Master. To transfer the Operations Master to a different Domain Controller, you need to target Active Directory Domains and Trusts to that Domain Controller.
and from AD domain and trust I can't move it.
I search in technet but I find only this article 265825 that says that this is a problem of microsoft product.
How can I move it? How can I workaround the problem?
Thanks for help
Daniele
I need to upgrade my forest from 2000 to 2003.
Before run Adprep utility I need to movo the schema FSMO role to another DC to unplug it from the network as written in Technet article.
But when I try to move it Schema from my server02 to my server03 from MMC schema snap in I recive this error message:
The current Domain Controller is the Operations Master. To transfer the Operations Master to a different Domain Controller, you need to target Active Directory Domains and Trusts to that Domain Controller.
and from AD domain and trust I can't move it.
I search in technet but I find only this article 265825 that says that this is a problem of microsoft product.
How can I move it? How can I workaround the problem?
Thanks for help
Daniele