G
Guest
Hi again,
I have 2 tables on the BE, 1 master table linked to FE, and one backup table
used to backup master before I update master using Transferspreadsheet. When
I copy master to backup, it must take the "linked" attribute and so when I
update master next, the backup gets updated as well, Which I don' want. Any
suggestions???
Thanks in advance,
Matt
(access 2000)
I have 2 tables on the BE, 1 master table linked to FE, and one backup table
used to backup master before I update master using Transferspreadsheet. When
I copy master to backup, it must take the "linked" attribute and so when I
update master next, the backup gets updated as well, Which I don' want. Any
suggestions???
Thanks in advance,
Matt
(access 2000)