G
Gary Paris
When bringing up VS 2003, there is a list of projects on the projects tab
which include the name of the project and date modified. Why doesn't the
date modified change when I modify the project?
For instance there was a project that I created on April 1st. The modified
date still says 4/1/05 but I have modified the project each day since.
Anybody know why?
Thanks,
Gary
which include the name of the project and date modified. Why doesn't the
date modified change when I modify the project?
For instance there was a project that I created on April 1st. The modified
date still says 4/1/05 but I have modified the project each day since.
Anybody know why?
Thanks,
Gary