I
Itan
Hi, I'm using PowerPoint 2007. I have 3 slides that link to the same chart
(named: chart1) in Excel. All the links on the 3 slides are set to MANUAL.
The idea is to change the parameter in chart1 and then update the manual link
in slide 1, then change the parameter in chart1 again and then update the
manual link in slide2, and same step with slide3. So, I should end up with 3
different charts in the 3 slides. However, when chart1 parameter is changed,
ALL 3 slides changed automatically to display the current chart1. So, all 3
slides will always show the thing eventhough the links on the 3 slides are
set to MANUAL link. How to fix this?? Please help!
(named: chart1) in Excel. All the links on the 3 slides are set to MANUAL.
The idea is to change the parameter in chart1 and then update the manual link
in slide 1, then change the parameter in chart1 again and then update the
manual link in slide2, and same step with slide3. So, I should end up with 3
different charts in the 3 slides. However, when chart1 parameter is changed,
ALL 3 slides changed automatically to display the current chart1. So, all 3
slides will always show the thing eventhough the links on the 3 slides are
set to MANUAL link. How to fix this?? Please help!