Im am starting to utilize Outlook a lot more for my scheduling but have
run into a bump in the road. I have set schedules based on an original
date. Lets say for example I have 25 events which occur based on a
single date, so the date is may 15th, and events 1, 2, 3 etc accour x
days before May 15 how do I keep these linked to the original date so
that if I change the date all the other events shift too?