G
Guest
Hi all,
Newbe here. I am designing a database that will track studnet test results over a three year period. There are 9 tests taken twice a year for three years. I was hoping to display a line graph depicting the progress (or lack thereof) of a student when viewing their record in the database. Considering that there are 9 tests I will have to multiple graphs per record.
My questions are, 1: is this possible? 2:Are forms the place to display these graphs or perhaps a report would be better? and 3:Can someone point me down the correct path to get started
Thanks
kjmeyer
Newbe here. I am designing a database that will track studnet test results over a three year period. There are 9 tests taken twice a year for three years. I was hoping to display a line graph depicting the progress (or lack thereof) of a student when viewing their record in the database. Considering that there are 9 tests I will have to multiple graphs per record.
My questions are, 1: is this possible? 2:Are forms the place to display these graphs or perhaps a report would be better? and 3:Can someone point me down the correct path to get started
Thanks
kjmeyer