D
Dawn
I collected data with two instruments at the same time.
One instrument was collecting data every 0.5 seconds and
the other was collecting every two seconds. I want to plot
the two data sets on the same x-axis to compare their
performance. Excel does not recognize the two time periods
are the same just different measuring frequencies. Any
help would be appreciated.
Thanks
One instrument was collecting data every 0.5 seconds and
the other was collecting every two seconds. I want to plot
the two data sets on the same x-axis to compare their
performance. Excel does not recognize the two time periods
are the same just different measuring frequencies. Any
help would be appreciated.
Thanks