H
Heera
Hi,
If i have some data in percentage month by month. In some of the
months i dont have any data.
In this condition if I draw a line graph the line goes down to 0% and
again it comes up which create a wrong picture in the mind.
Is there any way by which if there is no data for that particular
month it should directly get connected to the next month.
Regards
Heera
If i have some data in percentage month by month. In some of the
months i dont have any data.
In this condition if I draw a line graph the line goes down to 0% and
again it comes up which create a wrong picture in the mind.
Is there any way by which if there is no data for that particular
month it should directly get connected to the next month.
Regards
Heera