B
Bill
Hello
When I open My computer with a left mouse it goes to search.
When I open it with a right mouse the open tag is third on the list , how do
I move open to the top of the list so I can left open it.
thanks
Bill
When I open My computer with a left mouse it goes to search.
When I open it with a right mouse the open tag is third on the list , how do
I move open to the top of the list so I can left open it.
thanks
Bill