G
Guest
have a table set up (based on an the old EXCEL spreadsheet we used prior to
this)and I would like to be able to have the total gallons used calculated
from the beginning of a particular period to the end, by subtracting the
starting H20Meter reading by the ending H20 Meter reading. This is how my
table is set up:
GWID-autonumber
Date - Date/Time
Employee, Text
H20MeterReading - Number, long
GPM - Number, long (In excel, this field is popluated by subtracting last
H20 meter reading from previous.
24HRGAL-Number, long
Is the query or report the place to do this. Please let me know what I need
to do to fix this if I am wrong, etc. I am a newbie so please be gentle
this)and I would like to be able to have the total gallons used calculated
from the beginning of a particular period to the end, by subtracting the
starting H20Meter reading by the ending H20 Meter reading. This is how my
table is set up:
GWID-autonumber
Date - Date/Time
Employee, Text
H20MeterReading - Number, long
GPM - Number, long (In excel, this field is popluated by subtracting last
H20 meter reading from previous.
24HRGAL-Number, long
Is the query or report the place to do this. Please let me know what I need
to do to fix this if I am wrong, etc. I am a newbie so please be gentle