I have set up a database to perform our scheduling. I have been able to
create an automatic report that throws up all of our units every 6 and 12
months, however want to be able to create a check box or something of that
ilk to indicate when the schedule has been done. How am I to do this, I can
only think of manually creating another record for each schedule, but with
approximately 400 per month it may take a while and I am sure there is a way
to do this automatically. Any help would be greatly appreciated.