I have been having problems with trying to figure this
out. Where do I start with this. I have looked
everywhere for documentation. Getting bits and pieces,
but I think that I am missing the big picture. We are
all using Outlook 2000 or 2003. We are running Exchange
Server 2000. Can anyone point me in the direction that I
should be going< mainly where I should start. I know
that I should use group sheduling and when I try, I don't
see anything on the other users calendar and when I try
to enable permissions through tools, the permissions tab
is greyed out. Any insight would be great.
thks in advance
Nic
out. Where do I start with this. I have looked
everywhere for documentation. Getting bits and pieces,
but I think that I am missing the big picture. We are
all using Outlook 2000 or 2003. We are running Exchange
Server 2000. Can anyone point me in the direction that I
should be going< mainly where I should start. I know
that I should use group sheduling and when I try, I don't
see anything on the other users calendar and when I try
to enable permissions through tools, the permissions tab
is greyed out. Any insight would be great.
thks in advance
Nic