Gridview template field Calendar control with null data.

  • Thread starter Thread starter bob
  • Start date Start date
B

bob

Hi,
How can you bind a Calendar control in a template field when the data
is null?
i.e. The bound data is a null date. I would like to use a calendar
control in the edit template to update the data.
Is this possible?
thanks
Bob
 
Back
Top