G
Guest
HELP. I am trying to create a graph with 4 days figures in it in bar format.
I then want to add a line which would be the average figures. When I try and
do this the graph puts days 3 and 4 in line format. I can add more serires
to it and this gets rid of it. Must be a easier way
I then want to add a line which would be the average figures. When I try and
do this the graph puts days 3 and 4 in line format. I can add more serires
to it and this gets rid of it. Must be a easier way