gannt chart

  • Thread starter Thread starter Guest
  • Start date Start date
G

Guest

Hi,

I was wondering if there was a way to simulate a gannt chart using access
charts. I know they are limited but is there an add in to enable me to do
this.

Otherwise can i export to another program to create one?

Thanks
 
Hello,

Thanks for that link but I am having a problem with the report. When it runs
it has error 2100. The control is too large for this location. If you know
about this example would you be able to point me in the direction of solving
the problem. Thanks
 
Don't worry.
It was because one of the end dates were before the start date and it didn't
like it. Thanks.
 
Back
Top