FSMO Role Placement

  • Thread starter Thread starter BigHaig
  • Start date Start date
B

BigHaig

All,
Our Primary site is in Plano with three domain controllers all set at GC's,
we also have a DR site in Phoenix with two Domain Controllers set as GC's.
Would there be any impact in moving the FSMO roles to the Phoenix DC's,
rather than having to go through the process of seizing them after a
disaster? Site link for Phoenix to Plano is 4.5Mbps. We are a
Win2K3/Exch2k3 shop.

Thanks In Advance!
 
BigHaig said:
Our Primary site is in Plano with three domain controllers
all set at GC's, we also have a DR site in Phoenix with
two Domain Controllers set as GC's. Would there be any
impact in moving the FSMO roles to the Phoenix DC's,
rather than having to go through the process of seizing
them after a disaster? Site link for Phoenix to Plano
is 4.5Mbps. We are a Win2K3/Exch2k3 shop.
What if the DCs in Phoenix die first? There is a 2 in 5
chance that the first failure will be in Phoenix.

Cheers,

Cliff
 
Back
Top