I need to present Actual cost with a rolling forecast cost for a
calendar period in a Excel graph. The problem I'm facing is at the
actual fall's down to zero and the rolling forecast starts from zero.
How do I present a graph which has the first 6 months using a line, and
then next 6 months using a dotted line.
Thanks & Regards,
Nalaka.
I need to present Actual cost with a rolling forecast cost for a
calendar period in a Excel graph. The problem I'm facing is at the
actual fall's down to zero and the rolling forecast starts from zero.
How do I present a graph which has the first 6 months using a line, and
then next 6 months using a dotted line.
Thanks & Regards,
Nalaka.