Kim said:
I did my entire slide show and then added effects, bad decision! LOL!
Now I need to know how to change the duration of all of the frames at
once so I don't have to do each one seperatly. I can only figure out
how to do it to new frames being added, not frames already added.
Thanks for any help you can give me!
================================
As you have discovered...the setting change
at: Tools / Options / Advanced tab...only applies
to clips added to the timeline *after* you change
the setting.
If you switch to Storyboard view and select
all the clips as a batch...you can add the
"Speed Up, Double" or "Slow Down, Half"
effect to change the duration. Just select
all the clips / right click the Effect and from
the menu...choose...Add To Storyboard.
"Speed Up, Double" cuts the duration in half.
"Slow Down, Half" doubles the duration.
These effects can be added up to six times.
If you need a more accurate adjustment...
the following info might be useful:
You can change the duration for each clip
manually. Move your pointer around on the
edge of a clip until you see a double red
arrow. Now drag the double red arrow...
you'll see a tooltip that shows the duration
changing.
--
John Inzer MS-MVP
Digital Media Experience
Notice
This is not tech support
I am a volunteer
Solutions that work for
me may not work for you
Proceed at your own risk