Diagram formatting question

  • Thread starter Thread starter Albebach
  • Start date Start date
A

Albebach

Hi. I'm trying to have one subordinate box connected to two boxes above it.
How do I do that? Do I have to use the drawing features and make my own
lines?
 
Back
Top