DDE Links

  • Thread starter Thread starter Alectrical
  • Start date Start date
A

Alectrical

Hi
I have a number of DDE links from which I produce a graph, the links update
at source every second and I use the sheet calculate to update the
spreadsheet, however I find that the sheet updates more than every second.
How can I force the spreadsheet to update the links every second, is there a
time function I can use to do this.
Thanks in Advance
Alec
 
Thanks for your reply, a shall give it a try.

Is it possibe to update the links when one cell value changes, instead of
using the calculate method. I think this would be a simpler way of solving my
problem.

Thanks
Alec
 
Back
Top