R
Rosemarie
Need to create a macro to calculate step progression by date and frequency
-job code vs. # of steps (steps could be 1-11), and stop when maximum # step
is reached.
2) automatical calculate, job code vs. step frequency (4, 6, etc., week
before next step progression).
3) then calculate by date.
4) exclude employee's that have reached maximum step by entering a yes or no
-job code vs. # of steps (steps could be 1-11), and stop when maximum # step
is reached.
2) automatical calculate, job code vs. step frequency (4, 6, etc., week
before next step progression).
3) then calculate by date.
4) exclude employee's that have reached maximum step by entering a yes or no