J
John
I would like to track production start/stop times and then
convert the total time to minutes instead of hours and
minutes.
I have been using a formula like the one below for
figuring the total time
=(B1-A1+(B1<A1)) and that works fine.
A1: Start A2: Stop Total
1:00 am 3:15 am 2:15
What I would like to do is convert the total (2HR:15MIN)
to 135 minutes
convert the total time to minutes instead of hours and
minutes.
I have been using a formula like the one below for
figuring the total time
=(B1-A1+(B1<A1)) and that works fine.
A1: Start A2: Stop Total
1:00 am 3:15 am 2:15
What I would like to do is convert the total (2HR:15MIN)
to 135 minutes