Frank
I have a spreadsheet and in cell B2 is the date the project was created i.e
Feb/10/2010. I then have a column of blank cells that require a date entry.
I need a formula to turn the range of blank cells red if no date has been
entered after 7 days from the creation date.
Any advise??
Feb/10/2010. I then have a column of blank cells that require a date entry.
I need a formula to turn the range of blank cells red if no date has been
entered after 7 days from the creation date.
Any advise??