Can I give each axis in a radar chart a different scale?

  • Thread starter Thread starter Lesle
  • Start date Start date
L

Lesle

I would like to create a radar chart that contains about 6 different factors
representing overall project results (schedule index, cost index,
requirements volatility, etc.) 1 data series would represent the
organizational baseline, the other would represent the project results. Is
is possible to give each different factor/axis a different scale? Thanks for
any suggestions.
 
Back
Top