J
Jonathan Finney
I created two scheduled backup jobs to run at specific times, but I can't
see the jobs saved anywhere and when the time came nothing happened.
I had no success with Backup in Windows 2000 and was hoping it might be
better in XP, but I must be doing something wrong, but having been through
the wizard and checked everything using the Advanced view, I'm at a loss to
see what I'm doing wrong.
Shouldn't I be able to see the jobs listed somewhere in the program and be
able to edit them and make changes?
Backup products I've used before save the details of the backup (files &
locations, type of backup, compression, verification and where to back up)
as a backup job and any scheduling of this job separately, but Windows
Backup doesn't seem to do this. This appear to be a very inflexible
approach. Am I missing something?
see the jobs saved anywhere and when the time came nothing happened.
I had no success with Backup in Windows 2000 and was hoping it might be
better in XP, but I must be doing something wrong, but having been through
the wizard and checked everything using the Advanced view, I'm at a loss to
see what I'm doing wrong.
Shouldn't I be able to see the jobs listed somewhere in the program and be
able to edit them and make changes?
Backup products I've used before save the details of the backup (files &
locations, type of backup, compression, verification and where to back up)
as a backup job and any scheduling of this job separately, but Windows
Backup doesn't seem to do this. This appear to be a very inflexible
approach. Am I missing something?