A
Alan Whitehouse
Hi,
Using Outlook 2007 on Vista against Exchange Server 2007.
Is there anyway to automatically add "buffer" time to calendar entry as 2
separate appointments (one before and one after) for calendar entries?
I get a lot of meeting requests and people tend to book me back to back with
zero time in between meetings and if one goes a little long it screws up all
the rest. However, I don't want to have to go in and add each of these
appointment everytime I get a meeting request. So ideally when a meeting
request comes in I would like to be able to accept and then somehow have 2
additional appointments created before and after for some set time period
(not sure how much but something like 15 minutes or so).
Anyone know how I might accomplish this? Any add-on that might do it?
Thanks.
Alan
Using Outlook 2007 on Vista against Exchange Server 2007.
Is there anyway to automatically add "buffer" time to calendar entry as 2
separate appointments (one before and one after) for calendar entries?
I get a lot of meeting requests and people tend to book me back to back with
zero time in between meetings and if one goes a little long it screws up all
the rest. However, I don't want to have to go in and add each of these
appointment everytime I get a meeting request. So ideally when a meeting
request comes in I would like to be able to accept and then somehow have 2
additional appointments created before and after for some set time period
(not sure how much but something like 15 minutes or so).
Anyone know how I might accomplish this? Any add-on that might do it?
Thanks.
Alan