C
Chris Tate
When I create all day calendar events in MSN using the MSN Explorer, then
send and recieve my MSN account in Outlook 2002, it loads the calendar
events and changes them to the wrong day in Outlook. In fact, an event set
for a single day will change to to two days, both the original day and the
day before. And the times register differently. For example, a date entered
in MSN such as:
Thu 5/14/2004 9:00 AM
Thu 5/14/2004 10:00 AM
Will become two days in Outlook, as such:
Thu 5/13/2004 6:00 PM
Fri 5/14/2004 6:00 PM
Is there a way to make these programs consistent with each other?
send and recieve my MSN account in Outlook 2002, it loads the calendar
events and changes them to the wrong day in Outlook. In fact, an event set
for a single day will change to to two days, both the original day and the
day before. And the times register differently. For example, a date entered
in MSN such as:
Thu 5/14/2004 9:00 AM
Thu 5/14/2004 10:00 AM
Will become two days in Outlook, as such:
Thu 5/13/2004 6:00 PM
Fri 5/14/2004 6:00 PM
Is there a way to make these programs consistent with each other?