I need some help with the following database designed to
schedule houses to be built based in a production
facility.
I have an access database setup with the following fields:
PRO#, Retailer, Customer Name, Model#, #of floors
I need to have this database automatically schedule
houses to be built based on number of floors built per
day. If I am scheduled to build 5 floors/day, I need a
report showing what houses will get built when.
If I have 200 floors waiting to be built, I need to have
the database give me a daily schedule with dates in a
report format. I also need the report to tell me the
date of when the house will be completed based on a 7 day
construction time.
Is this possible? If so, what is the suggested method?
schedule houses to be built based in a production
facility.
I have an access database setup with the following fields:
PRO#, Retailer, Customer Name, Model#, #of floors
I need to have this database automatically schedule
houses to be built based on number of floors built per
day. If I am scheduled to build 5 floors/day, I need a
report showing what houses will get built when.
If I have 200 floors waiting to be built, I need to have
the database give me a daily schedule with dates in a
report format. I also need the report to tell me the
date of when the house will be completed based on a 7 day
construction time.
Is this possible? If so, what is the suggested method?