Accept all tracked changes?

  • Thread starter Thread starter Paul Souza
  • Start date Start date
P

Paul Souza

Someone please tell me that there is a quick way to
either supress the changes/edits in a document (not the
balloons; I know how to do that), or accept all of them
without having to go through every single one.

Thank you!

Paul
 
On the Reviewing toolbar is a button for Accept Change. Click on the arrow
beside that, and you'll get a menu that includes "Accept All Changes in
Document."

--
Suzanne S. Barnhill
Microsoft MVP (Word)
Words into Type
Fairhope, Alabama USA
Word MVP FAQ site: http://www.mvps.org/word
Email cannot be acknowledged; please post all follow-ups to the newsgroup so
all may benefit.
 
Back
Top